|
|
|
JPR Environmental provides a complete range of landscaping services to ecologists and their clients. We principally undertake the physical aspects of ecological mitigation plans for development and associated habitat creation or enhancement. We get involved in all stages of a project, from the initial site clearance through to final landscaping, building relationships with ground workers and other contractors to ensure the maximum effectiveness of the measures we help implement.
As an abiding principle, JPR Environmental strives to minimise the environmental impact of works we undertake.
One of our advantages is our adaptability to tailor our methods to the specific requirements of the site, for example, we will forego the use of large machinery, if not appropriate, and rely on muscle power to get a job done where this reduces potential damage to resident species.
JPR Environmental carries out topographical survey and mapping services with the latest equipment. Data can be fed into CAD and GIS systems which ensures measures are accurate. We offer ecologists and environmental managers a survey service for setting out, spot height information to enhance lidar data and base point set up. Height AOD and location accuracy is within 10 mm if required.
|
| |
JPR Environmental Ecological Contracting services include:
| • |
Wildlife sensitive site clearance |
| • |
Reserve management and advice |
| • |
Fencing for site isolation and protected species trapping |
| • |
Protected species translocation |
| • |
Pond and lake creation |
| • |
Ecological Clerk of Works |
| • |
Landscape profiling for habitat enhancement or creation |
| • |
Hibernacula construction |
| • |
Planting and revegetation |
|
|
| |
We are fully licensed and highly experienced in the control and eradication of Japanese Knotweed. Whether it be on a development site or in a private garden, we will survey the problem and recommend an effective programme to remove the invasive species.
Call us on 01453 811537 or email us with your ecological contracting enquiry.
|
|
| |
Reserve management - Rodley
Pond creation using Bentonite lining - Kites Hill
De-silting works and habitat creation - Arundel
Habitat creation - Basingstoke Canal
|
|
|
|
|
|
|
| |
 |
 |
 |
 |
Search bubble: bioengineering, build, conservation, construction, wetland, design, JPR Environmental, landscaping, reedbed, river, wildlife, Habitat, surveying, Ecological, Contractors, Erosion control, reeds & reedbed management, wetland management, aquatic plant supply, wildlife landscaping, protected species work. |
|