JPR Environmental
Tel: 01453 811537
Email: jpr@jprenvironmental.co.uk
Home About Us Contact Us Case Studies Client List Links
Our Core Services:
Wetlands
Protected Species
Erosion Control
Ecological Contracting
Reedbeds
Site preparation
  • wetlands.gif
  • site.gif
  • reedbeds.gif
  • erosion.gif
  • protected.gif
  • contracting.gif

 
Pond clearance - Birmingham Wildlife Trust
 

Ecological Contracting

Desilting works on ditches & ponds

Client: Birmingham Wildlife Trust

Winter 2010

   
 

Project outline

This was funded by Higher Level Stewardship funds (HLS) for the Birmingham & Black Country Wildlife Trust. The work was to de-silt ditches and ponds to improve conditions for a population of great crested newts. JPR also constructed a pond with bentonite liner to enhance the habitat with a particular reference to great crested newts.

 

 

wetlandsbirmingham
 
wetlandsbirmingham
 
 
 
  wildlife logo cwa logo CHAS iee logo Search bubble: bioengineering, build, conservation, construction, wetland, design, JPR Environmental, landscaping, reedbed, river, wildlife, Habitat, surveying, Ecological, Contractors, Erosion control, reeds & reedbed management, wetland management, aquatic plant supply, wildlife landscaping, protected species work.