Bank Reprofiling on Wotton Brook at Barnwood Park, Gloucester
Erosion Control & Flood Prevention Project
Client: Gloucester City Council
2009
Repaired and re-profiled bank section on Wotton Brook at Barnwood Park, Gloucester
Project outline
At an elbow of Wotton Brook as it enters Barnwood Park a section of bank had been eroded and sections of the park were being flooded at high water events as the water backed up at the corner. JPR Environmental was asked to redesign a 20m section of bank at the S shaped bend in the brook to prevent further flooding and erosion.
Services Provided
JPR Environmental installed pre-planted coir rolls on a bed of willow faggots at the base of the section affected by erosion to secure the toe of the bank. The higher section of bank was then reshaped and willow spiling installed to protect it during high water events. The outside bend of bank was re-profiled taking off about a metre in height for a 15m length to leave it 20cm higher than the mean water level. This allows the brook to flow over the bank and therefore pass more smoothly during flood events and prevent kicking back that was occurring and the damage this was causing to the opposite bank. The re-profiled section of bank was planted with native wetland species. The spoil generated from the bank was used to fill some depressions in the park and on backfilling another erosion control project in Gloucester.
Ecological Contracting
Ground works and landscaping for wildlife and mitigation.
Wildlife Fencing
Habitat isolation for amphibians and reptiles.
River Engineering
Flood prevention and management, level and flow control, bank reprofiling and channel realignment.
Erosion Control
Bank strengthening and revetment to combat erosion.
Wetland Design & Build
Design, construction and management of wetlands.
Reeds & Reedbed Construction
Design, construction and planting reedbeds. Suppliers of reeds.