Reedbed filter construction
Case study - Reedbeds and management
Client The Wildfowl & Wetlands Trust, Slimbridge
Project period June - August 2001
Project outline An isolated public toilet block at WWT Slimbridge has the waste water running into a septic tank. A source of water was needed to keep a nearby wetland area damper for more of the year. This water was to be sourced from the septic tanks by being pumped into two parallel overland flow reedbeds to treat it, reducing the biological oxygen demand. The treated water can then be used in the Slimbridge grounds water system.
Services provided Construction of embankment, laying of butyl liner, infilling of the ponds with soil, installing the pipework, supply and planting of the reeds.
Photo

Reedbed filter, the Wildfowl & Wetlands Trust, Slimbridge

Ecological Contracting
Link to our ecoligical contracting services
Ground works and landscaping for wildlife and mitigation.

Wildlife Fencing
Link to our newt and slow worm fencing services
Habitat isolation for amphibians and reptiles.

River Engineering
Link to our river engineering services
Flood prevention and management, level and flow control, bank reprofiling and channel realignment.

Erosion Control
Link to our erosion control services
Bank strengthening and revetment to combat erosion.

Wetland Design & Build
Link to our wetland design and build services
Design, construction and management of wetlands.

Reeds & Reedbed Construction
Link to our reed and reedbed construction services
Design, construction and planting reedbeds. Suppliers of reeds.