Planting up reedbed to polish water run off from oil depot
Common Reed project
Client WWT Consulting
2003
Reedbed soon after planting showing initial growth
Project outline
The rainwater run off from this oil distribution depot had to be treated to ensure that no oil was washed out into the surrounding environment. The final stage of this cleaning was to run the water through a reedbed for polishing. JPR Environmental was asked to plant up the reedbed.
Services Provided
We planted 2,000 reeds at 6 per m2 in the pre-constructed bed. We also undertook other landscaping on site and planted 30 semi-mature trees plus a hedgerow, and seeded the soil areas with grass.
Ecological Contracting
Ground works and landscaping for wildlife and mitigation.
Wildlife Fencing
Habitat isolation for amphibians and reptiles.
River Engineering
Flood prevention and management, level and flow control, bank reprofiling and channel realignment.
Erosion Control
Bank strengthening and revetment to combat erosion.
Wetland Design & Build
Design, construction and management of wetlands.
Reeds & Reedbed Construction
Design, construction and planting reedbeds. Suppliers of reeds.