The school wanted to create a pond to help teach pupils about nature and biodiversity. There was a spare piece of land suitable for the pond at the corner of the school playing field. JPR Environmental combined with a number of other local companies to create the pond at a nominal cost to the school.
Services Provided
JPR undertook the physical aspects of the construction process. We landscaped the area, lined the pond and created boardwalks, access points and railings to ensure the safety of the pupils using the facility.
The completed pond before filling
Ecological Contracting
Ground works and landscaping for wildlife and mitigation.
Wildlife Fencing
Habitat isolation for amphibians and reptiles.
River Engineering
Flood prevention and management, level and flow control, bank reprofiling and channel realignment.
Erosion Control
Bank strengthening and revetment to combat erosion.
Wetland Design & Build
Design, construction and management of wetlands.
Reeds & Reedbed Construction
Design, construction and planting reedbeds. Suppliers of reeds.